top of page

Search Results

204 items found for ""

  • EMMP Services for Communication Systems Installation at Mandai, Singapore

    Home / Projects Projects EMMP Services for Communication Systems Installation at Mandai, Singapore June 10, 2024 All Projects, Environmental & Ecology TEMBUSU Asia Consulting (TAC) was engaged to provide environmental consulting services for installation of a communication system in several sites at Mandai. These sites are part of the Mandai Rejuvenation Project (MRP), which covers 35.4 hectares. The MRP is adjacent to the Central Catchment Nature Reserve which is known to be ecologically sensitive. Hence, TAC’s role as an environmental consultant is critical in ensuring that the installation works do not adversely affect sensitive fauna, particularly due to the generation of noise and dust. TAC’s team of ecologists and environmental consultants recommended measures to be implemented and conducted regular site visits to ensure the measures are effective in reducing the impacts. Throughout the project duration, the EMMP was adapted in an iterative process. Our services enabled our client to conduct their project in an environmentally sensitive manner, thus moving towards fulfilling UN SDG 11: Sustainable Cities and Communities and SDG 15: Life on Land. #SDG11 #SustainableCitiesandCommunities #SDG15 #LifeOnLand Previous Back Next

  • Review and Verification of Sustainability Performance Target and KPI for Sustainability-linked Loan

    Home / Projects Projects Review and Verification of Sustainability Performance Target and KPI for Sustainability-linked Loan September 15, 2022 All Projects, Carbon & Sustainability TEMBUSU Asia Consulting (TAC) was appointed by a client to perform a review and verification of the Sustainability Performance Target (SPT) and Key Performance Indicators (KPI) baseline for a Sustainability-linked Loan. The client is a global multi-disciplinary contractor that undertakes the detailed engineering, procurement, fabrication, construction, and onshore pre-commissioning & commissioning of offshore topside modules and facilities for FPSOs (floating production storage and offloading vessels), FSOs (floating storage and offloading vessels), FLNGs (floating liquefied natural gas vessels), FSRUs (floating storage and regasification units) and Fixed Platforms, onshore modules for land-based plants for the Oil and Gas industry, as well as offshore and onshore renewables and green energy sectors. With a growing focus on Environmental, Social and Governance (ESG) agendas, the client strategically embeds sustainability into its business model while seeking incentives from sustainable financial products that are available in the capital market. In this project, GHG emissions reduction was identified as its SPT, as an independent party TAC performed the review of its SPT and KPI identification and verify its GHG inventory baseline in accordance with the International Standard ISO 14064-3:2019. Based on the verified baseline, the client has committed to reducing its GHG emissions intensity targets by a substantial amount in the next 5 years. This target is well-aligned with the Science-based Target of 1.5°C. Previous Back Next

  • Mandatory Packaging Reporting (MPR) Advisory for distributor and manufacturer of stationery and paper products in Singapore

    Home / Projects Projects Mandatory Packaging Reporting (MPR) Advisory for distributor and manufacturer of stationery and paper products in Singapore April 4, 2022 All Projects, Urban Resilience TEMBUSU Asia Consulting (TAC) was engaged by a distributor and manufacturer of stationery and paper products to provide advisory services in fulfilling NEA’s Mandatory Packaging Reporting (MPR) requirements. The regulation requires affected companies to report their primary, secondary, and tertiary packaging that has been circulated into the Singapore market. This reporting will help to lay the foundation for Singapore’s transition towards an Extended Producer Responsibility (EPR) framework for packaging waste management by 2025. TAC assisted the Client in understanding the reporting requirements, provided a method of collecting and presenting packaging data, recommended strategies and solutions in developing a packaging 3R plan, and guided the client in a successful NEA submission. We are proud to assist businesses in transitioning towards the circular economy, thus establishing a zero-waste nation in Singapore and fulfilling UN SDG 12: Sustainable Consumption and Production. Previous Back Next

  • Greenhouse Gas Emission Verification for Textile Manufacturer

    Home / Projects Projects Greenhouse Gas Emission Verification for Textile Manufacturer September 15, 2022 All Projects, Climate Change Adaptation & Mitigation TEMBUSU Asia Consulting (TAC) was appointed to provide Greenhouse Gas (GHG) emission verification for a vertically integrated textiles and apparel manufacturer who has operations in Malaysia, Cambodia, China, Vietnam, and Jordan. Our GHG verification will support our client’s sustainability strategy and their upcoming application for a Sustainability-linked loan (SLL). GHG emissions reduction was identified as the Sustainability Performance Target (SPT) for the SLL and it is a requirement for the GHG emissions baseline to be verified by an independent third party. The scope of work involves reviewing and verifying the client’s Scope 1 and 2 GHG emissions for 2019 and 2020 in accordance with ISO 14064-3:2019. A verification report with verification statement endorsed by TAC will be submitted to our client. Through this service, TAC supports our clients in transitioning to low carbon economy and strengthen their resilience in meeting SDG#13: Climate Action. For more information on our GHG Verification services, click here . Previous Back Next

  • Stack Extension for a Chemical Plant, Singapore

    Home / Projects Projects Stack Extension for a Chemical Plant, Singapore April 20, 2020 All Projects, Urban Resilience TEMBUSU Asia was awarded consultancy services on stack extension for a chemical plant in Singapore. The scope includes design review and endorsement of the steel frame that supports the 45 m long stack and its foundation design. We also provide statutory site supervision during construction and obtaining clearance from relevant authorities. Previous Back Next

  • Environmental Impact Study (EIS) for a Hotel Development Project in Singapore

    Home / Projects Projects Environmental Impact Study (EIS) for a Hotel Development Project in Singapore ​ All Projects, Environmental & Ecology TAC is appointed to conduct an Environment Impact Study (EIS) for a proposed hotel development project that is located next to a petrol station. Per National Environmental Agency requirements, any new development sited within 50m of a petrol station needs to conduct an EIS to assess for potential environmental impacts arising from activities at the petrol station. The petrol station operation generates various impacts related to vapor fumes, odor, and noise. Vehicle movement for refueling and the presence of repair & maintenance activities on-site may cause noise impacts. Other activities, including bulk fuel transfer, storage tank venting, and motor vehicle filling, may also deteriorate the air quality and create environmental impacts on hotel development. The EIS will monitor levels of vapor fumes and noise to assess the potential impacts of petrol station activities on the proposed hotel development. The EIS report will provide recommendations to reduce impacts concerning the air quality and noise to acceptable levels as required by relevant environmental standards. Previous Back Next

  • Environmental Services for the Reconstruction of a Water Treatment Plant in Singapore

    Home / Projects Projects Environmental Services for the Reconstruction of a Water Treatment Plant in Singapore August 26, 2021 All Projects, Environmental & Ecology TEMBUSU Asia Consulting was engaged to provide environmental services for the reconstruction of an existing water treatment plant in western Singapore. The plant is surrounded by important biodiversity, including birds and mammals of conservation significance inhabiting the forests, and rare aquatic fauna inhabiting the streams. An Environmental Impact Assessment (EIA) will be carried out during the design stage. The EIA work includes the establishment of baseline conditions within the study area via field surveys of environmental aspects including biodiversity, water quality, air quality and noise quality. The collected data would be analysed to assess the environmental impacts associated with the project site based on the proposed development plan. Given the importance of the site for biodiversity, the preparation of an Environmental Management and Monitoring Plan (EMMP) with recommended mitigation and monitoring measures will help to mitigate the adverse impacts generated during the construction stage and will lead to the project implementation in an environmentally sustainable way. TAC will also support the Client during the construction stage in overseeing the implementation of EMMP and reporting requirements. TEMBUSU Asia Consulting is committed to supporting the sustainable development of the infrastructure project and will assist the Client in developing the project in an environmentally responsible manner. Previous Back Next

  • EMMP Services for Proposed Industrial Development at Kranji, Singapore

    Home / Projects Projects EMMP Services for Proposed Industrial Development at Kranji, Singapore March 4, 2022 All Projects, Environmental & Ecology TEMBUSU Asia Consulting (TAC) was engaged to provide environmental consulting services for an industrial project in Kranji. Given the rich biodiversity inhabiting the mangroves and mudflats along the coast, TAC would recommend measures to ensure that the works do not adversely affect sensitive fauna, particularly due to the generation of noise from industrial activities. Our services enabled our client to conduct their project in an environmentally sensitive manner, thus moving towards fulfilling UN SDG 11: Sustainable Cities and Communities and SDG 15: Life on Land. Previous Back Next

  • Environmental Impact Study (EIS) for an industrial development in north-western Singapore

    Home / Projects Projects Environmental Impact Study (EIS) for an industrial development in north-western Singapore May 6, 2021 All Projects, Environmental & Ecology TEMBUSU Asia Consulting was commissioned to conduct an Environmental Impact Study (EIS) for the land clearance of an industrial development in north-western Singapore. The scope of this EIS includes a biodiversity study to establish the ecological baseline of the project site, an assessment of the impacts of land clearance on the environment, and the recommendation of appropriate measures to mitigate these impacts. TEMBUSU Asia will also conduct biodiversity awareness training to brief key personnel on biodiversity issues pertaining to the project, including species found at the project site, the importance of biodiversity conservation, and ways to avoid human-wildlife conflict. We believe that by working with and providing sound recommendations to the Client, we will be able to help minimise adverse impacts on the surrounding natural environment for the duration of this project. Previous Back Next

  • Consultancy Services for Conversion of Existing Warehouse into F&B Manufacturing Plant

    Home / Projects Projects Consultancy Services for Conversion of Existing Warehouse into F&B Manufacturing Plant December 17, 2020 All Projects, Urban Resilience TEMBUSU Asia Consulting was awarded a project in Singapore by an EPC company to provide consultancy services for a food and beverage processing company to convert an existing warehouse to a manufacturing plant. The scope includes a design review on civil & structure, building services, fire protection and detection system, design for safety, energy efficiency opportunities assessment etc. and to obtain clearance from various planning and technical authorities. TAC also provides statutory site supervision and support throughout the construction stage in order to obtain certificate of statutory completion. Through the conversion process and repurposing of their existing warehouse, TAC supports our Client in keeping their carbon emission footprint low, which is in line with our commitment to SDG#9: “Industry, Innovation and Infrastructure”. Previous Back Next

  • EMMP for construction of Transport Link to Malaysia

    Home / Projects Projects EMMP for construction of Transport Link to Malaysia April 9, 2021 All Projects, Environmental & Ecology TEMBUSU Asia Consulting was awarded an Environmental Management and Monitoring Plan (EMMP) project for the construction of LTA viaduct and tunnels for the transport link that will connect Malaysia and Singapore. The scope covers the development of a detailed construction EMMP framework during the pre-construction stage, outlining the mitigation and management measures for all environmental aspects to ensure that the proposed works do not adversely affect the environment surrounding the project site. In addition, a biodiversity management plan will be prepared along with a reporting system to monitor the implementation of the EMMP. A biodiversity awareness training will also be provided prior to construction activities to train the personnel on the ecological sensitivity of the site. Given that the project is located within a forested area, TEMBUSU Asia will provide support for monitoring the environmental aspects during the construction stage, especially on biodiversity issues. Environmental monitoring is a critical tool for assessing the effectiveness of EMMP and all recommended mitigation measures. This will help to mitigate the adverse impacts generated from the project’s activities, leading to the environmentally sustainable implementation of the development. Previous Back Next

  • Workplace Safety & Health Services for EPCM Project

    Home / Projects Projects Workplace Safety & Health Services for EPCM Project May 23, 2019 All Projects, Urban Resilience TEMBUSU Asia has been engaged by a major EPCM Company for providing Workplace Safety & Health (WSH) services during the construction stage of their upcoming mega chemical plant in Tuas area of Singapore. Prior to this project, TEMBUSU Asia has provided consultancy services for the client during the design stage to fulfil its duty as an Occupier of construction workplace under WSH Act and related regulations. The consultance scope include assistance in the preparation of WSH framework for EPCM project covering WSH management plans & procedures. It also includes the review of existing company WSH documents to identify an gaps vis-a-vis Singapore WSHframework. We will deploy the WSH consultant at site to inspect and review of implementation of site WSH practices. Also, our scope includes Design-for-Safety (DfS) services in which our registered DfS Professional will assist client to fulfil its duties under DfS regulation. We will also help client in preparation of external CONSASS audit of WSH management system. Previous Back Next

bottom of page