PROJECT

Tuas Desalination Plant (Singapore)
The desalination plant was constructed under a design, build, own and operate (DBOO) model. With a daily capacity of up to 30 million gallons (130,000 m3) of water. The plant is designed to supply water over a 20-year period. The Environmental Impact Assessment included detailed assessment of water quality and ecological impacts associated with plant construction and operation.
WE ARE COMMITTED TO SUSTAINABLE DEVELOPMENT
At TEMBUSU Asia, we have place the SDGs at the heart of everything that we do. The SDGs embrace strategies that build sustainable growth whilst addressING a range of sustainability goals on the nexus between energy, water and food security, while tackling climate change and promoting environmental protection.
TEMBUSU ASIA CONSULTING
At TEMBUSU ASIA CONSULTING, our professional consulting engineers, scientists and management consultants are committed to creating sustainable and long-term solutions for our customers and society.